loading

Professional Brush Making Machine Manufacturer since 1988.CHINA

The mechanical life of the tufting machine depends to a large extent on the amount of wear during the running-in period

by:MX machinery      2021-05-10

The mechanical equipment management department of the tufting machine did not implement the importance of mechanical maintenance to every person related to the machinery, resulting in the maintenance of the machinery is only a slogan of the corresponding management department. Many construction units always believe that the quality of the mechanical technology is mainly determined by the repair unit. They think that the hair planting machine is mechanically nested and unable to work because the repair unit has not kept up with the repair force and poor ability. The mechanical life of the tufting machine depends to a large extent on the amount of wear during the running-in period. A new car must be run-in for the first time. Generally, the running time of construction machinery should be more than 100 hours, and the load should be less than 80%. Some construction companies don't pay attention to running-in, and the purchased new machinery is directly put into use. The new machine or the mechanical equipment after the overhaul must be well run-in. During the run-in period, the driving speed should be controlled, the work load should be reduced, and the maintenance should be strengthened. In order to reduce the amount of engine start-up wear, you can use the hand crank to rotate the engine crankshaft before starting, try to make the oil reach the friction surfaces first, and do not let the engine stall when stopping for a short time. The engine can not be started for more than 30 seconds at a time, and it should be started twice. There should be one minute interval. Too long continuous starting time will affect the service life of the battery and the starting motor, especially in the cold winter. It should be noted that the engine cannot be started for more than three times and can not be started again. You should immediately find a repairer to check the fault and eliminate it. Can start again in the future, Foshan Taifenglai Brush Machine Machinery Factory http://www.gd-tfl.com/ With the continuous development of science and technology, more and more new technologies, new materials, new processes and new The functions of the construction machinery are continuously integrated into the construction machinery and equipment, which requires higher and higher requirements for the operators of the construction machinery and equipment. The good technical level of the operators can greatly improve the utilization and intact rate of construction machinery, avoid damage to construction machinery due to human factors, shorten the maintenance time and maintenance cycle of construction machinery, and create good economic benefits for the enterprise.

Custom message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: