loading

Professional Brush Making Machine Manufacturer since 1988.CHINA

pvc pool hose reel

by:MX machinery      2020-11-18
This PVC pool hose reel costs around $25.
You can find all the materials in the local hardware store and make them with simple tools.
And get more benefits: 1.
The hose is wound vertically on the reel;
The internal water of the wet hose can be discharged from the low end opening of the hose even after the hose is wound in sequence. 2.
To release any twist and twist of the hose in the water, the arm unpacks the hose before the Reel 3 is wound.
Vertical reels can be removed from the base to relax the hose by gravity (it\'s fast). 4.
It can also carry and store hoses, brushes, vacuum heads and leaf harrows.
PVC pipe grade 200pe grade \"PVC pipe: 15\" sch40 grade \"PVC pipe: 3\" sch40 grade \"PVC pipe: 2\" 6 \"PEX pipesPex\" pipe:
Dropper system used)
Micro pipe: 1 \"PVC fittings\" tee: 22 \"elbow: 7\" coupling: 2 \"Cross: 3\" cap: 3 \"x\" tee: 3 \"x\" Bushing: 41 \"coupling: 1 screw: 2 snap Springs (
Clip for pool bar)
Card buckle: 1 Measuring device epen or pencil saw or PVC cutter pvc cementdrill 9/64 \"drill bit\" drill bit 5/8 \"drill screw driverWood chisel or 110\" 26 \"76 with saw or PVC 200pe grade\" pipe size pcs18\" \"65\" 14 \"14\" 13 \"13\" 12 \"62\" 81 \"11\" 2Sch40 \"pipe size pcs6\" 53 \"1Sch40\" pipe size pcs21 \"16\" 12 \"1Pex\" pcs4 \"2 micro pipes\" Pipe Size pcs \"2 x\" sleeve, cut into pieces from the bottom \"(small ends).
Throw away the top.
Keep the bottom of two bushing with length \"x.
Cut a \"coupling\" into two pieces from the middle.
Remove the coupling lip on the two semi-\"coupling pieces.
Take two T-shirts and make an inverted U hole on it.
Mark the inverted U line in the middle of the tee as up \"level 1 1/8\" down \".
There are 9/64 \"drill holes on the ends and corners of the line.
Cut the U hole with a chisel or knife.
The width of the hole allows the thickness of the 1 \"screw to move smoothly in it.
We need two tee for the inverted U hole.
Now we can assemble two opposite bolts.
One is the left side Bolt and the other is the right side Bolt.
Assemble the left Bolt first.
Assemble a \"x\" bushing bottom, a half \"coupling piece, a 200pe grade PVC pipe of 1\" length, a tee with inverted U holes and the entire \"x\" bushing.
Then place a 4 \"Pex of length\" pipe through the holes of the two bushing and align.
Pass a 1 \"screw through a miniature pipe with a length of\" and enter the Pex \"pipe through the right end of the tee inverted U hole.
Assemble the right side bolts in the same way, but instead.
They are like latches, so I call them latches.
Glue all the PVC together.
Assemble a \"three-way\", a 200pe class of 2 \"length\" PVC pipe \", an\" elbow \", a 200pe class of 2\" length \"PVC pipe\" and
Glue all the PVC together.
Assemble a \"lid\", a 2 \"length class 200pe class\" PVC pipe *, a \"tee\" and a second 2 \"length class 200pe class\" PVC pipe.
Put the 6 \"length Sch40 class\" PVC pipe * through the second 200pe class \"PVC pipe\" into the assembly interior and close it with the second \"lid.
Glue all the PVC together.
* The two \"pipes must be a 200pe class with a larger inner diameter so that\" pipes can go through the inside.
* Do not glue the Sch40 grade PVC pipe of 6 \"length with glue.
It\'s like a bearing here. Never glue it.
Assemble a 1-length 200pe grade PVC pipe *, elbow.
Glue the elbows and tubes together.
Make sure the pipe is pushed to the end of the elbow.
Mark the center of the hole on the \"tee\" 3/8 from its edge.
Install the tee on the pipe, close the tee and elbow and align.
Drill holes with a \"drill\" on the mark.
Drill another hole on the other side in the same way.
Separate the tee with a tube.
Put the buckle clip into the pipe and card into the hole.
Chamfer the holes on the tee so that we can easily open the clip with our fingers.
Now we get a clip lock for the clip lock elbow and the clip lock tee.
They will be assembled in two parts.
Reel body and arm, the clip lock is used to lock the two parts together.
* The pipe must be a 200pe grade PVC pipe with a larger inner diameter so that the clip can be placed in it.
Assemble the axle from bottom to top in order: 3 \"length class 200pe class\" PVC pipe *, a \"cross\", 2 \"length class 200pe class\" PVC pipe, the second cross crosses 90 degrees, the second 2 degrees, the length is 200pe class, the third Cross, the 6 \"length class 200pe class\" PVC pipe and handle we made in the previous step turn the handle 45 degrees.
Assemble the spokes on each cross with 6 \"length class 200pe grade\" PVC pipes.
Assemble the first hub rod in sequence from the bottom to the top: the left side Bolt we made in the previous step, PVC pipe with length of 2 \"class 200pe grade\", tee, one 6 \"long 200pe class\" PVC pipe, the second \"three links\", the second 6 \"length class 200pe class\" PVC pipe and clip lock elbow we made in the previous step.
Assemble the second hub rod in order from bottom to top: 2 \"length class 200pe grade\" PVC pipe, this is the hook we made in the previous step, 6 \"long 200pe class\" PVC pipe, a \"tee, 10\" long 200pe class \"PVC pipe and a\" elbow.
Assemble the third hub rod in sequence from the bottom to the top: the right side Bolt we made in the previous step, PVC pipe with length of 2 \"class 200pe grade\", tee, A 6 \"long 200pe class\" PVC pipe, the second \"three links\", the second 6 \"long\" PVC pipe and elbow with a length of 200pe class.
Assemble the fourth bub bar in order from the bottom to the top: 2 \"class 200pe grade\" PVC pipe \",\" Tee \", class 200pe grade\" PVC pipe and \"elbow\" with length of 10 \".
Assemble all hub rods into spokes in sequence.
Glue all the PVC together.
The reel body is ready.
* All pipes on the shaft must be a \"PVC pipe\" of the 200pe class, which has a larger inner diameter so that the \"Sch40 class\" PVC pipe can pass through the reel as the shaft.
Assemble the clamp lock tee, 2 \"length class 200pe class\" PVC pipe and the \"x\" tee with 90 degree rotation.
Assemble the 4 \"length class 200pe grade\" PVC pipe into the \"x\" tee.
2 The \"length class 200pe class\" PVC pipe passes through 1 \"coupling * and then two\" x \"tee links are connected.
The clip lock tee and the 4 \"tube are parallel up.
The arm head is ready. Don’t glue yet.
* Do not glue 1 \"coupling.
It is a rolling element to unlock the hose.
A \"three links\", a \"length\" class 200pe grade \"PVC pipe\" and a second \"three links\" and two \"length\" class 200pe grades \"PVC pipe\"
This is 1 feet pedal assembly. Align and glue.
Take two tee, take one inner lip, scrape the inside or sand until it slides and rotates on the pipe.
It is a hinge that removes another inner lip in the same way and cuts 1 \"from the edge \".
It is a pedal connector.
Another option is to shop online.
Slip tee can\'t be found in the local hardware store.
Assemble 18 \"length class 200pe grade\" PVC pipes as arms with hinges.
Put the 18 \"length class 200pe class\" PVC pipe into the pedal connector and slide down until the short side of the pedal connector (
We have cut the side of 1)
Close to the hinge.
Glue pedal joints here.
Do not glue the hinge with an 18 \"tube.
Assemble the 2 \"length class 200pe class\" PVC pipe of the pedal onto the pedal connector of the arm lever, and turn the pedal 30 degrees with the arm lever.
Assemble the \"x\" tee on the side of the arm head clip lock tee to the 18 \"length class 200pe class\" PVC pipe of the arm rod and turn the arm head 45 degrees.
The reel arm is ready. Don’t glue yet.
Assemble a 4 \"long 200pe class\" PVC pipe, an \"elbow\", a 2 \"long 200pe class\" PVC pipe and a \"tee \". Align and glue.
The arm stopper is ready.
Assemble a \"coupling\" with a class 200pe grade PVC pipe of 2 \"length \". Glue them.
The Bolt catcher is ready.
Assemble a \"three links\", a Sch40 class \"PVC pipe * with a length of 6\", the second \"three links \", the second 6 \"length Sch40\" PVC pipe is turned 90 degrees forward with the third \"three links.
It is the rear side base.
Assemble a \"three links\", a Sch40 grade \"PVC pipe\" with a length of 6 \"and a second\" three links \", the arm plugs we have previously made come together with a 5 \"length 200pe class\" PVC pipe.
The 5 \"pipe on the left side and the second\" tee rotate 90 degrees back.
The arm plug tube is parallel to the front and left side of the 5 \"tube.
It is the front side base.
Assemble two 6 \"length Sch40 grade\" PVC pipes, 21 \"length Sch40 grade\" PVC pipes onto the \"x\" tee.
The PVC pipe with a length of 21 \"Sch40\" is the shaft of the reel.
This assembly is a shaft seat.
The rear-side base, front-side base and shaft seat are then assembled together. Align and glue.
Make sure the 21 \"axis is perpendicular to the base.
The reel base is ready.
* It is recommended to use the Sch40 grade PVC pipe in these five reel base positions to enhance the base.
Other pipes are recommended to use 200pe grade PVC to obtain reel lights.
Slide the hinge of the reel arm onto the 5 \"length class 200pe class\" PVC pipe of the reel base and assemble a \"elbow\" at the end of the 5 \"pipe \".
Stick your elbows on.
Assemble our previously manufactured Bolt trap onto the right tee of the rear base. Don’t glue yet.
Slide the main shaft of the reel to the shaft of the reel base.
Lock the clip lock tee with the clip lock elbow and secure the arm on the reel.
Slide the pex pipe of the left and right bolts out.
Use a pencil to mark the pex pipe on the arm and the bolt catcher on the rear base.
Drill a hole in the arm as the grip of the left bolt of the reel body, drill a hole in the Bolt trap at the bottom of the reel as the grip of the right Bolt, both with 5/8\"
Since we don\'t have glue, we can take them out and drill holes.
Chamfer the edge of the hole makes it easy for the pex pipe to slip in.
Reassemble the arm and Bolt catcher.
Install the hole with stain, please patch if needed.
Accessories clip lock, here you need to do some patches, for example, fix the top of the sand clip to a more rounded place, and then fix the inside of the sand clip tee to facilitate locking them in
Stick the arm rod to the hinge.
Adjust the angle of the arm pedal and the head of the arm. Glue them*.
Stick the bolt catcher to the base.
* Do not glue 1 \"coupling.
It is a rolling element to unlock the hose.
You have a nice pool hose reel. Try it.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: